Project Details

We supplied and installed sour natural gas wellsite facilities (licensed to 99ppm H2S) for four (4) horizontal wells on the existing pad site.

OEL completed the coordination and detailed engineering, procurement and regulatory work for the design of the wellsite facilities. Quality assurance on the mechanical, civil and structural and electrical and instrumentation design were met in accordance with all applicable regulations and codes.

Project Scope

  • Two (2) 3.5MMBTU/hr dual lineheater/meter combo packages.
  • Complete with ScadaPack 32 RTU
  • Two (2) Thrmoelectric Generator
  • Two (2) Methanol storage tanks (1,000Gal)
  • One (1) Corrosion Inhibitor Tank (1,000Gal)